Joint trench
(composite) engineering
Sacramento Engineering Consultants Joint trench (composite) engineering Services
 

PROJECT CASE STUDY

Siemens and EATL (Eastern Alberta Trasmission Line), and WATL (Western Alberta Transmission Line) - Siemens, a multinational enterprise is installing 500 KV HVDC transmission lines in Alberta, Canada. This project is utilizing newly invented technology to read on...
 
Wall-mart

PROJECT CASE STUDY

Wall-Mart Case Study - In 2004 Sacramento Engineering Consultants was approached by Wal-Mart to engineer fire protection plans for a California Store as they had continual difficulties in obtaining fire protection plan permits. Wal-Mart was very pleased with the service we provided. Since that time we have engineered fire protection plans for over 130 stores in dozens of states read on...
Joint trench (composite) engineering - Coordination with utility companies, power, telephone, cable TV, and gas for creation of unified site plan for to ensure the most economic installation of site utilities.

In addition to traditional joint trench engineering we provide full utility company high voltage design to speed the often very time consuming utility design process.

We have engineered these composite drawings on several dozens of projects such as multiple commercial building sites and multi family residences, where site coordination is critical.